2026-01-15

The project is progressing. I am simply remiss in posting

Doreen is in Milwaukee even as I post this.

She is documenting plumbing and electrical while the walls are open:



as well as making sure that everything else is proceeding apace. 

This is where the ice box door used to be

This is where the milk chute used to be

The kitchen radiator

I believe that the tile should be finalized soon. I hope to get some layouts to post here.

That is it for now. I hope we can have construction images next

No comments:

Post a Comment