The kitchen floor is in.
These are the installers. The one in front talks a lot, the one in the back does not talk at all.
I like both types.
In Process
Done. except for the final sanding and finishing. It should stay about this color.
Bathroom Cabinets are installed. This is the Primary. We are waiting for the kitchen countertops so the countertop folks only need to come out once
Back yard - framing and pouring the patio:
Doreen directing the pour:
Washing the top of the concrete off so you can see the aggregate. I think I was saying "Fascinating!"
Looks great!
Refinishing Tub and Finishing Bathroom:
These guys do a great job.
This window was painted. Now look at it!
The colors are not quite true, but this is the living room. I will get better photos later.
We uncovered the wood floors upstairs. They are in surprisingly good shape! This is the twin bedroom (the boy's room)
This is the Primary bedroom. A little polish and wax, and they will be done.
We saved a touch of the historic pink plaster.
We are moving in in about a week and a half. The kitchen will not be done, but we will make do.
More soon.
No comments:
Post a Comment